Gestaltung von verschleißfesten Rohr für Beton Pumpe LKW Vermittlung
Concrete conveying pump car wear-resistant pipe design concrete pipe, sollte
according to the engineering and construction site characteristics, Beton
pouring scheme for piping. It is advisable to shorten the pipe length and use
less elbow and hose.
Die Verlegung der Förderleitung soll eine sichere Konstruktion gewährleisten, easy to clean
the pipe, Fehlersuche und Demontage Wartung. In der gleichen Pipeline, die
concrete conveying pipe of the same pipe diameter should be used, and the new
pipe should be arranged in a larger pressure place at the same time when new and
1st pipe sections are used, and the pipeline should be arranged horizontally and
vertically. The layout of the pipe should be drawn, listing all kinds of pipe
Armaturen, pipe connecting ring, elbow and other specifications and quantities,
and make a list of spare parts. The concrete conveying pipe should be selected
according to the maximum size of coarse aggregate, the type of concrete pump,
the conveying distance of concrete output and the difficulty of conveying. Die
conveying pipe shall have the strength suitable for the pumping condition. You
should use a pipe segment with no cracks, no bump damage, and no bends. Die
joint of the conveying pipe should be tight, strong enough, and can be quickly
installed and disassembled.
When the minimum pipe diameter of the conveying pipe is loomm, the maximum size
of coarse aggregate can not exceed 25mm, and the minimum diameter is 125mm, die
maximum size can not exceed 40mm. Vertical pipe, die horizontale Rohrlänge
sollte nicht weniger als ein Viertel der Länge des vertikalen Rohr, und
sollte nicht weniger als 15 m, oder den Bestimmungen des Produktes entsprechen
Spezifikation.
Ein Cut-off-Ventil wird an der Wurzel der Förderstrecke eingestellt werden, am 3 ~ 6m
Das Y-förmige Rohr entladen Port der Betonpumpe, des Betons zu verhindern
Mischen von fließt zurück. Beim Bau der unterirdischen Struktur Pumpen,
die horizontale Rohrachse sollte senkrecht auf die Y-förmige Rohr
Entladung Port Achse.
When tilting the pipe downward, the upper end of the inclined tube shall be
provided with a discharge valve, and when the height difference is greater than
20m, the horizontal tube of 5 times times the height difference length should be
set up at the lower end of the oblique pipe; The fixed concrete conveying pipe
shall not be directly supported in the steel bar, formwork and embedded parts,
the horizontal tube should be at a certain distance with a stent, cushion,
hanging fixture, etc.. to facilitate the removal of plugging, installation and
cleaning pipelines, vertical pipe should be fixed with embedded parts of the
wall and pillar or floor of the roof left hole place. On walls and columns, each
pipe shall not be less than 1 fixed points and shall be fixed at each floor of
the floor reservation. The bent pipe at the lower end of the vertical tube
should not be used as the support point of the upper pipe. It is advisable to
set the steel support to bear the vertical pipe weight. When the vertical pipe
is fixed on the scaffold, das Gerüst entsprechend verstärkt werden kann die
müssen.
Der Rohr FALZKLEMME Ort wird Gülle nicht auslaufen.. Die heiße Jahreszeit-Bau,
sollte das Tuch Nass Abdeckung verwenden, den warmen Grasfangsack und so weiter zur Deckung der
konkrete Förderstrecke, vermeidet die Tageslicht-Beleuchtung. Kalten Jahreszeit
Bau, Es ist ratsam, Wärmedämmung Material zu verwenden, um zu decken}
Kun-Boden Förderstrecke, um den Beton in das Rohr Einfrieren zu verhindern, und zu
die Temperatur des Betons in die Form zu gewährleisten.
(Pumpe Schlauch) Wenn die horizontale fördertechnische Entfernung 200 m überschreitet, vertical
transmission distance of more than 40m, conveying pipe vertical downward or
oblique pipe front layout horizontal tube,} Kun-ning soil mixing unit cement
dosage is lower than 300kg/m3, must be reasonable choice of piping method and
pumping process, it is advisable to use a large diameter concrete pipe and long
conical tube, Use less elbow and hose.
When the conveying height exceeds the maximum conveying distance of the concrete
Pumpe, it can be pumped by the relay pump (subsequent pump). In Ergänzung,
nach den technischen Merkmalen der Struktur, Bautechnik,
Tuch-Anforderungen und Bedingungen der Rohrleitungen, etc., Wählen Sie Tuch Ausrüstung.
Je nach Größe der Struktur-Ebene, Rohrleitungen-Situation und die Länge der die
Vertrieb-bar, Das Layout der Tuch-Ausrüstung, und es sollte in der Lage
Abdeckung der gesamten Struktur-Ebene, und einheitlich sein können, rasche Tuch.
Das Tuch-Gerät sollte fest und stabil montiert werden.